Customer hired us to install tile in her front walkway, she had old tile near the front door and wanted that replaced, we first demoed the old tile than we pressure washed the floor. After the floor was dry and ready for the Tile Install we started the job. When it comes to Tile Install you need a good thinset so the tile will stick to it especially when its outdoors. The Customer chose the tile and we picked it up from the supply house.Job duration took 2 days.