Customer hired us to replace a portion of her Shadow Box Fence in her back yard, the total LF was 19 and one 4 ft gate in the middle, the challenge with this job was the post were close to the pool side walk so we had to be extra careful when extracting the old Wood Fence the style is called Shadow Box Fence, once we took out the old Wood Fence we installed first the posts than we installed the Shadow Box Fence sections into place. for a savings we saved the old Fence Gate it is a metal frame and will last a long time. Job duration took 1 day.